Karlovy Vary - Replacement heat source 19 MWt

It was a complex project in which we designed, supplied, installed and revived a new source of hot water with a maximum output of 19 MWt at the Karlovy Vary heating plant in Bohatice.

This is the primary circuit of the hot water network, which ensures the supply of heat in the summer months, when the main source from the Vřesová Power Plant is shut down.

The circuit consists of two BOSH boiler units, three circulation pumps, chemical dosing and a pair of plate heat exchangers that transfer heat to the secondary circuit. The delivery also included the construction part, the electrical and MaR part and modification of the customer's existing control system.